
Costs · 3 min read · 21.10.2026
At an injection molding plant, scrap was reported in kilograms, so nobody knew what it cost in money. By measuring scrap by press and by shift, we uncovered hidden costs of half a million euros a year and differences between shifts of up to 4%.

Costs · 4 min read · 29.07.2026
An engineering company with 240 employees was losing margin on small batches — long changeovers, overtime and a 4.2% scrap rate. The project paid for itself in five months: changeover time fell to 12 minutes and scrap dropped by 38%.