We recently worked on a project with two plants belonging to the same manufacturer. Nearly identical consumption, identical machines, identical shift schedule. The electricity bill differed by several thousand euros a month. The difference wasn't caused by consumption. It was caused by a single line on the invoice the operations director had never looked at before: the charge for peak demand and reserved capacity.
Electricity prices are rising again. Reports that large manufacturers are massively investing in peak-shaving and their own generation only confirm that the energy bill is returning to executives' desks. But it's not just the price per kWh that's going up. A large share of companies also pay for how fast and how much all at once they draw electricity. These charges typically make up 15–30% of the bill and are independent of how much energy you actually consume in the end.
How the Peak Demand Charge Is Calculated and Where to Find It on Your Invoice
In Slovakia, you pay for the agreed reserved capacity — the power input you reserve with your distribution company. If you exceed it, penalties or additional payments follow. In the Czech Republic, you pay for the highest half-hour power draw in the billing period. A different mechanism, the same principle: one brief moment in a month sets your price for the entire month.
Find the items on your invoice such as "reserved capacity charge", "network charge" or "highest half-hour demand". On a single sheet of paper, write down four things: the capacity you have agreed, what your actual peak was, how much you pay per month, and what would happen if the peak were 20% lower. At most of the companies we've seen, the actual maximum demand is 30–50% lower than the agreed reservation. They are therefore paying monthly for capacity they never use.

Find Your Most Expensive Half-Hour
Upon request, the distribution company will provide you with half-hourly demand profiles free of charge. Some companies have them directly in their online portal. You need two weeks of data and the answer to one question: when does the maximum occur and what is running at that moment?
The typical culprits are always the same:
- Shift start. At 6:00 a.m., all lines, the compressor, extraction and hall lighting switch on at once. Five machines ramp up to full current draw in the same minute.
- Post-maintenance test runs. Friday afternoon or Monday morning — maintenance tests three machines simultaneously just to "get it over with".
- The furnace and the compressor at once. Firing up a heating furnace requires a multiple of its rated power input precisely when everything else is already running.
One of these events is almost certainly setting your most expensive half-hour of the month. Most of the time, it's Monday at 6:00 a.m.
Most of the time, we cause the most expensive half-hour of the month ourselves. The joker who presses the "START" button on eight machines at once in the morning does more damage than a whole month of steady operation can save.
Stagger Your Start-Ups Without Investment
The solution doesn't require batteries, control systems or software. It requires discipline and one sheet of paper from the shift foreman:
- Line start-up sequence. Lines and machines are switched on at 5–10 minute intervals. Shift start takes 20 minutes longer. The peak drops by tens of percent.
- Furnace firing outside the morning. Move furnace preheating to the night or to before 5:00, while the rest of the hall is still asleep.
- Compressor cascade. Two compressors should never ramp up to full output at the same time. A timer will solve it. Or simply a clear instruction for the foreman.
- Reassess your main breaker and agreed capacity. If the real peak drops from 620 to 410 kW after staggering, review your reserved capacity. At the price per kilowatt of reservation, that's thousands of euros a year.
Concrete numbers from one project. A manufacturer with an agreed capacity of 700 kW and a typical peak of 640 kW at the Sunday start of the week. After staggering the start-ups and moving the furnace firing, the peak dropped to 480 kW. The reservation was reduced to 520 kW. The company saved €1,800 a month — without a euro of investment, just by precisely scheduling what gets switched on and when.
If you want to dig deeper into cost structure, take a look at our solutions for cost reduction in manufacturing. The energy peak is just one of the items that can be tackled without interfering with the production process.
Key Takeaways
- 15–30% of the electricity bill consists of charges that depend on peak demand, not consumption — find them on your invoice and count them up.
- Request half-hourly demand profiles from your distribution company (free of charge) and find your maximum — it's usually shift start or Monday morning.
- Introduce a start-up sequence with 5–10 minute intervals, move furnace firing outside the morning peak, and link your compressors into a cascade.
- After staggering, reassess your agreed reserved capacity — the difference between the agreed and actual peak is a pure monthly money leak.
Monday morning: pull out your latest invoice, request the half-hourly demand profile, and task your foremen with writing down the start-up sequence. None of this requires investment approval or a consultant. Once you know how much a kilowatt of peak costs you, also look at converting the electricity price into your cost per produced piece. That will show you how much of your margin is being eaten up every morning when you switch everything on at once.
Energy at up to 40% of operating costs: convert kWh into cost per piece