Client

A manufacturing company with 165 employees, annual turnover of approximately EUR 14 million, production running in one and a half shifts. The programme consists of custom-made machining of components and welded assemblies for industrial customers. We present the company anonymously — this is a composite case study from our projects in this segment, not a single specific client.

The project was initiated by the managing director. Orders were coming in, but every major decision ended up on his desk. He spent his afternoons dealing with problems that the production manager and foremen should have been solving.

Challenge

Supplier disputes, overtime, distorted welds — everything was escalated all the way to the managing director. Operational problems were addressed once a month at a meeting, without figures and without accountability for actions. On-time delivery (OTD) had long been stuck at 68 %. Production operated in firefighting mode: people reacted to whatever was burning at the moment, and planning was non-existent.

The company had grown from roughly 55 to 165 people over ten years, but its management processes remained at the level of a fifty-person company. Penalties for delays, overtime as the standard, the managing director as the bottleneck. When he was away on a business trip for a week, decision-making effectively came to a halt.

Approach

  1. Management diagnostics. Over three weeks, we mapped where decisions were made, who actually resolved them and through which channels. The output was an overview of escalations and a list of 12 recurring types of problems without an owner.
  2. Design of a layered management system. Three levels of meetings: 15-minute daily shop-floor meetings, a weekly production meeting with KPIs, and a monthly management meeting reserved for strategic topics only. Each level has defined inputs, outputs and decision-making authority.
  3. KPI visualisation. Boards displaying OTD, number of complaints, absenteeism and the status of at-risk orders were added to the shop floor. Hand-filled in and readable at a glance. The figures are posted by supervisors and foremen themselves — so they understand them and take responsibility for them.
  4. Leadership training and pilot run. The production manager and foremen practised running short meetings and formulating actions with deadlines and accountability. The system ran for two months in one production area as a pilot, after which we rolled it out to the entire company.
  5. The managing director stepping back. The managing director gradually stopped dealing with operational escalations. At the monthly meeting, he contributed only figures and strategic topics — not distorted welds.

Results

The first results showed as early as the second month after the daily meetings were launched:

  • On-time delivery (OTD) increased from 68 % to 91 % within eight months.
  • 80 % of decisions are now resolved directly at the point where the problem occurs, without escalation.
  • The number of escalations to management dropped by half.

What did not happen: no new people were hired for management positions, and no investment was made in software. The system runs on boards, markers and the discipline of a daily meeting. The daily meetings continue to work even after our departure — management has adopted them as their own tool.